
Renewables that earn their place on the P&L.
Solar, battery and EV charging for warehouses, manufacturing, hospitality, care and the public sector — designed around your load profile, installed without disruption.
Postcode + number is enough — we'll call back within one working day.
Rooftop and ground-mount solar from 50kWp to multi-megawatt. CapEx, lease or PPA-funded.
Peak-shave DUoS red-band, stack flexibility revenue and defer expensive grid upgrades.
Workplace, fleet and ultra-rapid charging. Load-managed installs avoid most grid upgrades.
Built for how your business actually runs.
From single-site SMEs to multi-site operators, we've delivered projects across every major sector in Scotland.
How a commercial project runs
A single point of contact from first call to switch-on — and after.
- 01
Enquiry & load profile
Send us 12 months of half-hourly data and a site postcode — we sanity-check feasibility fast.
- 02
Site survey & design
Structural, electrical and shading survey. Yield model tuned to your actual operating hours.
- 03
DNO & funding
We handle G99 / connection paperwork and structure CapEx, lease or PPA options against your numbers.
- 04
Install without disruption
Phased works around your operations. Trained CSCS engineers, full RAMS, no subcontracted crews.
- 05
O&M and reporting
Monitoring, annual servicing and clear performance reporting — so the asset keeps earning.

Send us 12 months of HH data + postcode. We'll model yield, savings and payback — honest answer either way.
Request feasibility →Rooftop, ground-mount, battery and fleet EV case studies with real numbers — sent same day.
Request the pack →Testimonials
What our clients say
Real feedback from the projects we've delivered across Scotland.
"Eastern Electric installed thirteen 530W solar panels and a 10kWh myenergi libbi battery in my home. The service was excellent from start to finish. Communication was clear and quick, installation was completed as planned and the workmanship is of an excellent standard. The site was left spotless. I would certainly recommend Eastern Electric."
Ewan Swann
Homeowner · Edinburgh
"Cut our electricity from around £40/day to roughly £5/day between April and September. Eastern Electric handled the solar, the battery and the single-to-three-phase supply upgrade in one package — proper commercial job."
Commercial client
Site manager · Haddington, East Lothian
"Delivered 18 × 200kW EV chargers and the grid connection to support fleet electrification. Scale, planning and delivery were exactly what we needed for a depot environment."
Fleet operator
Depot operations · Scottish transport company
Same team also installs at home.
MCS-certified solar, batteries and EV chargers for Scottish homes — including funding via Home Energy Scotland.
Ready to find out what's possible?
Free assessment, honest sizing, costed proposal within one working day.
- MCS · NICEIC · TrustMark
- In-house engineers, never subbed
- Reply within one working day
- No sales pressure — ever
60-second request — we reply within one working day.
