Case study · Commercial · East Lothian
Haddington: 40.2kWp ground-mount solar & 69kWh battery.
A full commercial package — ground-mount PV, three-phase battery storage, and a single-to-three-phase supply upgrade — cutting site electricity spend from around £40/day to roughly £5/day between April and September.
- Sector
- Commercial
- System
- 40.2kWp PV
- Storage
- 69kWh
- DNO
- G99
Overview
Eastern Electric delivered a complete commercial ground-mount solar PV and battery storage system for a client near Haddington, East Lothian, including the coordination of a site supply upgrade from single-phase to three-phase as part of the overall package.
The client operates two properties from the same site and was previously spending approximately £40 per day on electricity. The objective was to reduce grid import, make better use of available land, and store surplus solar for use outside peak generation periods.
A roof-mounted system wasn't the preferred option for this site, so a ground-mounted array was designed and installed to maximise generation potential.

The challenge
The solution

Technical specification
| Solar PV capacity | 40.2kWp |
|---|---|
| Solar panels | 76 × Longi Hi-MO X6 530W |
| Solar inverter | Solis 40kW three-phase S5 |
| Battery system | Fox AC-coupled storage |
| Battery inverters | Fox 10kW three-phase AC-coupled |
| Batteries | 6 × Fox EP12 |
| Battery capacity | 69kWh nominal |
| Mounting | Ground mount, screw foundations |
| Original supply | Single-phase |
| Supply upgrade | Arranged as part of the project |
| Final supply | Three-phase |
| DNO application | G99 |


The result
Before
~£40/day
site electricity spend
Apr–Sep
~£5/day
after PV + battery
Oct–Mar
~£12/day
shoulder & winter months
Key benefits
- Electricity cost cut from ~£40/day to ~£5/day (Apr–Sep)
- ~£12/day electricity cost the rest of the year
- 40.2kWp of on-site solar generation
- 69kWh nominal battery storage capacity
- Battery storage increases self-consumption
- Export used to offset remaining grid costs
- Single-to-three-phase supply upgrade arranged in-package
- Full three-phase commercial design
- G99 DNO application completed
- Ground-mounted where roof mounting wasn't preferred