Case study · Commercial · Transport & fleet

Depot fleet charging: 18 × 200kW EV chargers & grid connection.

High-capacity EV charging infrastructure delivered for a Scottish transport operator — 3.6MW of installed charging capacity plus the grid connection to support it.

Sector
Transport
Chargers
18 × 200kW
Capacity
3.6MW
Grid
Provided

Overview

Eastern Electric delivered commercial EV charging infrastructure to support the electrification of a transport company's fleet operations in Scotland.

The project included the provision of a suitable grid connection and the installation of 18 × 200kW EV chargers, creating a high-capacity charging solution for a fleet environment.

This was not a domestic or workplace charging project. The scale of the installation required careful planning around electrical capacity, charger demand, vehicle movements, operational requirements and future fleet use.

200kW dual-outlet DC fast charger installed in the depot with bollard protection
A single 200kW dual-outlet DC fast charger — one of 18 units across the depot.

The challenge

Fleet charging presents very different challenges from standard EV charger installations. A transport operator needs infrastructure that can support high vehicle demand, tight operating schedules and repeat daily use.
  • Providing sufficient electrical capacity for high-power EV charging
  • Supporting multiple 200kW chargers on a single site
  • Designing infrastructure suitable for transport operations
  • Allowing vehicles to charge around fleet schedules
  • A robust, scalable installation for depot use
  • Coordinating the grid connection required for the load

The solution

Eastern Electric provided the electrical infrastructure required to support a commercial EV charging installation consisting of 18 × 200kW chargers. A suitable grid connection was provided as part of the project, enabling the site to support the full charging capacity required for fleet operations.
  • Grid connection provision
  • High-capacity EV charging infrastructure
  • 18 × 200kW charger installation
  • Fleet charging requirements
  • Electrical distribution and protection
  • Practical installation for depot vehicle use

Technical specification

Project typeCommercial EV charging infrastructure
SectorTransport / fleet operations
EV chargers18 × 200kW
Total installed charger capacity3.6MW
Grid connectionProvided as part of the project
Solar PVNot included
Battery storageNot included
ApplicationDepot / fleet charging
Client nameNot disclosed

The result

Chargers

18

× 200kW DC fast

Capacity

3.6MW

installed on site

Grid

Delivered

as part of the project

The completed project provided the transport operator with high-capacity EV charging infrastructure capable of supporting fleet electrification — multiple high-power charging sessions and ongoing commercial vehicle operations, day in, day out. This project demonstrates Eastern Electric's capability beyond standard EV charger installation, with experience in larger-scale commercial infrastructure where grid capacity, electrical design and operational requirements are critical.

Key benefits

  • 18 × 200kW commercial EV chargers installed
  • 3.6MW total installed charging capacity
  • Grid connection provided as part of the project
  • Infrastructure designed for transport fleet operations
  • Suitable for high-demand depot charging
  • Supports fleet electrification
  • Demonstrates large-scale commercial electrical capability

Electrifying a fleet or depot?