Case study · Commercial · Transport & fleet
Depot fleet charging: 18 × 200kW EV chargers & grid connection.
High-capacity EV charging infrastructure delivered for a Scottish transport operator — 3.6MW of installed charging capacity plus the grid connection to support it.
- Sector
- Transport
- Chargers
- 18 × 200kW
- Capacity
- 3.6MW
- Grid
- Provided
Overview
Eastern Electric delivered commercial EV charging infrastructure to support the electrification of a transport company's fleet operations in Scotland.
The project included the provision of a suitable grid connection and the installation of 18 × 200kW EV chargers, creating a high-capacity charging solution for a fleet environment.
This was not a domestic or workplace charging project. The scale of the installation required careful planning around electrical capacity, charger demand, vehicle movements, operational requirements and future fleet use.

The challenge
- • Providing sufficient electrical capacity for high-power EV charging
- • Supporting multiple 200kW chargers on a single site
- • Designing infrastructure suitable for transport operations
- • Allowing vehicles to charge around fleet schedules
- • A robust, scalable installation for depot use
- • Coordinating the grid connection required for the load
The solution
- • Grid connection provision
- • High-capacity EV charging infrastructure
- • 18 × 200kW charger installation
- • Fleet charging requirements
- • Electrical distribution and protection
- • Practical installation for depot vehicle use
Technical specification
| Project type | Commercial EV charging infrastructure |
|---|---|
| Sector | Transport / fleet operations |
| EV chargers | 18 × 200kW |
| Total installed charger capacity | 3.6MW |
| Grid connection | Provided as part of the project |
| Solar PV | Not included |
| Battery storage | Not included |
| Application | Depot / fleet charging |
| Client name | Not disclosed |
The result
Chargers
18
× 200kW DC fast
Capacity
3.6MW
installed on site
Grid
Delivered
as part of the project
Key benefits
- 18 × 200kW commercial EV chargers installed
- 3.6MW total installed charging capacity
- Grid connection provided as part of the project
- Infrastructure designed for transport fleet operations
- Suitable for high-demand depot charging
- Supports fleet electrification
- Demonstrates large-scale commercial electrical capability
Electrifying a fleet or depot?
We design, install and commission commercial EV charging infrastructure across Scotland — including grid connections, DNO applications, distribution and protection.